Additional information on the following bids may be obtained by calling (707) 826-3512.
PW24-2 2024 Interior WiFi Lock Installation, Project XPL280
Project Status: Our for bids
The following files are available:
- IFB Exhibits A-E and G-H
- IFB Exhibit F
- Plan Holders List (TBD)
- Bid Opening Zoom Meeting Information
Engineering and Technology Building - Posting on Behalf of Swinerton Builders
PW24-1 Cal Poly Humboldt BSS & KA Buildings Boiler Replacement, Project XPL293
Project Status: Awarded to Adams Commerical General Contracting
The following files are available:
- IFB Exhibits A-E and I-J
- IFB Exhibit F Permitted Drawings
- IFB Exhibit G Project Manual
- IFB Exhibit H Construction Laydown Area Map
- IFB Exhibit K Hazmat Report
- Plan Holders List
- Bid Opening Zoom Meeting Information
- Pre-Bid Meeting Attendance (Revised)
- Addendum #1
- Bid Results
PW23-JOC, Job Order Contract
(Note: Bidders must be prequalified with the Trustees to submit a bid.)
Project Status: Awarded to Johnson Controls and Staples Construction.
The following files are available:
- IFB Exhibits A-G
- IFB Exhibit H – Technical Specifications
- IFB Exhibit I – Construction Task Catalog
- PreBid Zoom Meeting Information
- PreBid Meeting Bidding Information
- PreBid Meeting Prequalification Information
- Bid Opening Zoom Meeting Information
- PreBid Meeting Agenda
- Plan Holders List
- PreBid Meeting Presentation
- PreBid Meeting Attendance
- Bid Results
PW23-3, Health, Dining and Housing Building Project, Project #PLY106
Request for Proposals (RFP) for Collaborative Design-Build Services
Project Status: Awarded to Sundt Construction, Inc.
The following files are available:
- RFP Table of Contents
- Request for Proposal (Final)
- Exhibit A1 HDH: Site Survey
- Exhibit A2 Jenkins Hall: Site Survey
- Exhibit B1 HDH: Geotechnical Report
- Exhibit B2 Jenkins Hall: Geotechnical Report
- Exhibit B3 Jenkins Hall: Updated Geotechnical Recommendations
- Exhibit C CDB Contract General Conditions
- Exhibit D CDB Supplementary General Conditions
- Exhibit E Special Condtions: None
- Exhibit F Construction Area Maps
- Exhibit G CDB Procedures Manual
- Exhibit H TIP Standards for Data and Technology
- Exhibit I CSU Seismic Requirements
- Exhibit J CSU Mechanical and Electrical Design Guide
- Exhibt K CSU Control System Design Guide
- Exhibit L Prevailing Wage Cover Sheet
- Exhibit M Design Assist & DB Subcontracting
- Exhibit N Campus Utility Map
- Exhibit O1 Jenkins Hall: Asbestos & Lead Survey
- Exhibit O2 Jenkins Hall: Abatement Specifications
- Exhibit O3 Sculpture Lab: Survey (by addendum)
- Exhibit O4 Ceramics Lab: Survey (by addendum)
- Exhibit P1 Jenkins Hall: Plan Excerpts
- Exhibit P2 Jenkins Hall: Seismic Evaluation
- Exhibit P3 Jenkins Hall: Seismic Peer Review
- RFP Appendix A1, Fee Proposal Form (Word) Revised
- RFP Appendix A2, All Forms
- Appendix B Subcontractor Prequalification Form #1
- Appendix B Subcontractor Prequalification Form #2
- Appendix C Design-Builder Agreement for Design Phase (Phase 1)
- Appendix D Design-Build Construction Services Agreement (Phase 2)
- Addendum #1
- Addendum #2
- Addendum #3
- Bid Results
Request for Qualifications (RFQ) for Collaborative Design-Build Services
Project Status: RFP Issued to Shortlist
The following files are available:
- RFQ Notice to Contractors
- RFQ
- RFQ Attachment 1A, Programming & Feasibility Study
- RFQ Attachment 1B, Alternate Site Study
- RFQ Attachment 2, Jenkins Hall Test Fit
- RFQ Attachment 3, Contract General Conditions
- RFQ Attachment 4, Supplementary General Conditions
- Planholders List
- Respondents Zoom Meeting Info
- Respondents Zoom Meeting Attendance
- Addendum #1
PW23-2, Student Health and Counseling Building & Gutswurrak Student Activities Center Roof Restoration, Various Projects
Project Status: Awarded to Ark Design Construction and Roofing, Inc.
The following files are available:
- IFB Exhibits A-E and I-J
- IFB Exhibit F Permitted Drawings (Revised)
- IFB Exhibit G Project Manual (Revised)
- IFB Exhibit H Construction Laydown Area Map
- IFB Exhibit K Asbestos Data Report
- Plan Holders List
- Bid Opening Zoom Meeting Information
- Pre-Bid Meeting Attendance
- Addendum #1
- Addendum #2
- Addendum #3
- Bid Results
PW23-1, Library Flat Roof Replacement, Project XPL277
Project Status: Awarded to Adams Commercial General Contracting
The following files are available:
- IFB Exhibits A-E and I-J
- IFB Exhibit F Library Flat Roof Drawings (Revised)
- IFB Exhibit G Project Manual (Revised)
- IFB Exhibit H Construction Laydown Area Map
- IFB Exhibit K Asbestos and Lead Data Summary
- IFB Pre-Bid Meeting Attendance
- Addendum #1
- Addendum #2
- Bid Results
PW22-5, SRC West Athletic Training Room, Project XPL290
Project Status: Failed Bid
The following files are available:
- IFB Exhibits A-E and I-J
- IFB Exhibit F Permitted Drawings
- IFB Exhibit G Project Manual
- IFB Exhibit H Construction Laydown Area Map
- Plan Holders List
- Bid Opening Zoom Meeting Information
- Addendum #1
PW22-2, Energy Research + Sustainability Center, Project PLY105
Request for Proposals (RFP) for Collaborative Design-Build Services
Project Status: Awarded to Swinerton Builders - SmithGroup
The following files are available:
- RFP Table of Contents (Revised)
- RFP (Final)
- RFP Exhibit A Site Survey
- RFP Exhibit B Site Utilities
- RFP Exhibit C CDB Contract General Conditions
- RFP Exhibit D CDB Supplementary General Conditions Exhibit E No Special Conditions
- RFP Exhibit E Special Conditions - NONE
- RFP Exhibit F CDB Procedures Manual
- RFP Exhibit G TIP Standards for Data and Technology
- RFP Exhibit H CSU Seismic Standards
- RFP Exhibit I CSU Mechanical and Electrical Design Guide
- RFP Exhibit J CSU Control System Design Guide
- RFP Exhibit K Prevailing Wage Cover Sheet
- RFP Exhibit L Design-Assist for Subcontractor Guidelines
- RFP Appendix A1, Fee Proposal (Word) (Revised)
- RFP Appendix A2, All Forms
- RFP Appendix B, Subcontractor Prequalification Form #1
- RFP Appendix B, Subcontractor Prequalification Form #2
- RFP Appendix C Design-Build Agreement for Design Phase (Phase 1)
- RFP Appendix D Design-Build Construction Services Agreement (Phase 2)
- Bid Results
Request for Qualifications (RFQ) for Collaborative Design-Build Services
Project Status: Short List Determined
The following files are available:
- RFQ Notice to Contractors
- RFQ
- RFQ Attachment 1, Programming & Feasibility Study
- RFQ Attachment 2, Contract General Conditions
- RFQ Attachment 3, Supplementary General Conditions
- Plan Holders List
- Respondents Zoom Meeting Info
- Addendum #1
- Addendum #2
PW22-1, Engineering & Technology Building, and Student Housing Building, Project PLY101
Request for Proposals (RFP) for Collaborative Design-Build Services
Project Status: Awarded to Swinerton Builders
The following files are available:
- RFP Table of Contents (Revised)
- RFP (Final)
- RFP Exhibit A Site Survey
- RFP Exhibit B Previous Site Development
- RFP Exhibit C CDB Contract General Conditions
- RFP Exhibit D CDB Supplementary General Conditions (Revised)
- RFP Exhibit E Special Conditions - NONE
- RFP Exhibit F CDB Procedures Manual
- RFP Exhibit G TIP Standards for Data and Technology
- RFP Exhibit H CSU Seismic Standards
- RFP Exhibit I CSU Mechanical and Electrical Design Guide
- RFP Exhibit J CSU Control System Design Guide
- RFP Exhibit K Prevailing Wage Cover Sheet
- RFP Exhibit L Design-Assist for Subcontractor Guidelines
- RFP Appendix A1, Fee Proposal Form (Word) (Revised)
- RFP Appendix A2, All Forms
- RFP Appendix B, Subcontractor Prequalification Form #1
- RFP Appendix B, Subcontractor Prequalification Form #2
- RFP Appendix C Design-Builder Agreement for Design Phase (Phase 1)
- RFP Appendix D Design-Build Construction Services Agreement (Phase 2)
- RFP Campus Events Field CAD Drawings
- RFP Addendum #1
- RFP Addendum #2
- Bid Results
Request for Qualifications (RFQ) for Collaborative Design-Build Services
Project Status: Short List Determined
The following files are available:
- RFQ Notice to Contractors (Revised)
- RFQ (Revised)
- RFQ Attachment 1, Programming & Feasibility Study
- RFQ Attachment 2, Contract General Conditions
- RFQ Attachment 3, Supplementary General Conditions
- Planholders List
- Respondents Zoom Meeting Info
- Respondents Zoom Meeting Attendance
- Addendum #1
- Addendum #2
PW22-JOC, Job Order Contract
(Note: Bidders must be prequalified with the Trustees to submit a bid.)
Project Status: Awarded to Johnson Controls, Staples Construction and Pierson Company
The following files are available:
- IFB Exhibits A-G
- IFB Exhibit H – Technical Specifications
- IFB Exhibit I – Construction Task Catalog
- PreBid Zoom Meeting Information
- PreBid Meeting Bidding Information
- PreBid Meeting Prequalification Information
- Bid Opening Zoom Meeting Information
- PreBid Meeting Attendance
- PreBid Meeting Presentation
- Addendum #1
- Addendum #2
- Plan Holders List
- Bid Results
PW21-6, SRC Field House Turf Replacement, Project XPL285
Project Status: Awarded to FieldTurf, USA
The following files are available:
- IFB Exhibits A-E and H-I
- Exhibit F Permit Set
- Exhibit Fa Campus Location Map
- Exhibit Fb Turf Replacement Specs Stamped
- Exhibit G Turf Replacement Laydown
- Planholders List
- Bid Opening Zoom Meeting Information
- Addendum #1
- Addendum #2
- Pre-Bid Meeting Attendance
- Bid Results
PW21-5, Canyon Residence Halls Fire Alarm Replacement, Project XHS240
Project Status: Awarded to Robert Colburn Electric, Inc.
The following files are available:
- IFB Exhibits A-E and I-J
- Exhibit F Project Manual
- Exhibit G Drawings
- Exhibit H Campus Map
- Exhibit H1 Laydown and Parking Map
- Planholders List
- Bid Opening Zoom Meeting Information
- Addendum #1
- Addendum #2
- Addendum #3
- Bid Results
PW21-3, Sunset Roof Replacement
Project Status: Awarded to Adams Construction
The following files are available:
- IFB Exhibits A-E and K-L (Revised)
- Exhibit F HazMat Report
- Exhibit G Project Manual
- Exhibit H Sunset Hall
- Exhibit I Sunset Roof Conformed Drawings
- Exhibit J Laydown & Dumpsters
- Plan Holders List
- Bid Opening Zoom Meeting Information
- Addendum #1
- Addendum #2 (Revised)
- Bid Results
PW21-4 Automatic Doors Replacement Projects XHS241, XUC008, XPL205
Project Status: Out for Bids
The following files are available:
- IFB Exhibits A-E and K-L
- Exhibit F Project Manual
- Exhibit G Scope of Work
- Exhibit Ha JGC Bid Documents
- Exhibit Hb Library Bid Documents
- Exhibit Hc UC Bid Documents
- Exhibit Ia Specifications 3000 Series
- Exhibit Ib Specifications 5200/5300 Series
- Exhibit Ja Laydowns
- Exhibit Jb Campus Map
- Exhibit Ha JGC Bid Documents
- Plan Holders List
Bid Opening Zoom Meeting Information
PW21-2, Craftsman Student Housing, Project #PLY100
Request for Proposals (RFP) for Collaborative Design-Build Services
Project Status: Awarded to Sundt Construction, Inc.
The following files are available:
- RFP Table of Contents (Revised for Final RFP)
- RFP (Revised for Final RFP)
- RFP Exhibit A, Project Concepts
- RFP Exhibit B, Draft EIR Previous Development
- RFP Exhibit C, CDB Contract General Conditions
- RFP Exhibit D, CDB Supplementary General Conditions
- RFP Exhibit E, Special Conditions
- RFP Exhibit F, Construction Area Maps
- RFP Exhibit G CDB Procedures Manual
- RFP Exhibit H TIP Standards for Data and Technology
- RFP Exhibit I CSU Seismic Standards
- RFP Exhibit J CSU Mechanical and Electrical Design Guide
- RFP Exhibit K CSU Control System Design Guide
- RFP Exhibit L Prevailing Wage Cover Page
- RFP Exhibit M, Design Assist and DB Subcontracting
- RFP Exhibit N, City Utility Map
- RFP Appendix A1, Fee Proposal Form (Word)
- RFP Appendix A2, All Forms But Fee Proposal Form
- RFP Appendix B, Subcontractor Prequalification Form #1
- RFP Appendix B, Subcontractor Prequalification Form #2
- RFP Appendix C, Design-Build Agreement Forms
- RFP Appendix D, Construction Agreement Forms
- Addendum #1
- Bid Results
Request for Qualifications (RFQ) for Collaborative Design-Build Services
Project Status: Short List Determined
The following files are available:
- RFQ Notice to Contractors
- RFQ
- RFQ Attachment 1, Site & Building Concept
- RFQ Attachment 2, Draft EIR
- RFQ Attachment 3, Contract General Conditions
- RFQ Attachment 4, Supplementary General Conditions
- Addendum #1
- Addendum #2
- Addendum #3
- Addendum #4
- Addendum #5
- Addendum #6
- Planholders List
- Respondents Zoom Meeting Info
- RFQ Respondents Conference Attendance
PW21-JOC, Job Order Contract
(Note: Bidders must be prequalified with the Trustees to submit a bid.)
Project Status: Bids Under Review
The following files are available:
- IFB Exhibits A-G
- IFB Exhibit H – Technical Specifications
- IFB Exhibit I – Construction Task Catalog
- PreBid Zoom Meeting Information
- PreBid Meeting Bidding Information
- PreBid Meeting Prequalification Information
- Bid Opening Zoom Meeting Information
- Plan Holders List
- Gordian PreBid Meeting Presentation
- PW21-JOC Addendum 1
- PW21-JOC Addendum 2
- PW21-JOC Addendum 3
- PreBid Zoom Meeting Information
- PreBid Zoom Meeting Attendance
- Bid Results
PW20-1, Emergency Power Generation, Various Projects
(Note: Bidders must be prequalified with the Trustees to submit a bid.)
Project Status: Bids Under Review
The following files are available:
- IFB Exhibits A-E and I-J
- IFB Exhibit F, Project Manual
- IFB Exhibit G1, Forbes Drawings
- IFB Exhibit G1A, Forbes Specifications
- IFB Exhibit G2, JGC Drawings
- IFB Exhibit G2A, JGC Specifications
- IFB Exhibit G3, SHC Drawings
- IFB Exhibit G3A, SHC Specifications
- IFB Exhibit H1, Construction Area Map Combined
- IFB Exhibit H2, Campus Site Map
- PreBid Zoom Meeting Information
- Bid Opening Zoom Meeting Information
- Addendum #1 & Exhibit G1B
- Addendum #2
- Addendum #3
- Addendum #4
- PreBid Zoom Meeting Attendance Sheet
- Plan Holders List
- Bid Results
PW20-JOC, Job Order Contract
(Note: Bidders must be prequalified with the Trustees to submit a bid.)
Project Status: Bid Under Review
The following files are available:
- IFB Exhibits A-G
- IFB Exhibit H – Technical Specifications
- IFB Exhibit I – Construction Task Catalog
- PreBid Zoom Meeting Information
- PreBid Meeting Agenda
- Gordian PreBid Meeting Presentation
- PreBid Meeting Bidding Information
- PreBid Meeting Prequalification Information
- Using the Construction Task Catalogue
- Using the Construction Task Catalogue Summary
- Bid Opening Zoom Meeting Information
- Addendum #1
- PreBid Zoom Meeting Attendance Sheet
- Plan Holders List
- Bid Results
PW20-2, Mini Split Heat Pump, Project #XHF034
Project Status: Awarded to California Heating
The following files are available:
- IFB Exhibits A-F and J-K
- IFB Exhibit G, Drawings
- IFB Exhibit H, Construction Area Map
- IFB Exhibit I, Campus Site Map
- IFB Bid Opening Zoom Meeting Information
- Addendum #1
- Addendum #2
- Pre-Bid Meeting Attendance
- Plan Holders List
- Bid Results
PW20-3, Telonicher Marine Lab Room 121 Floor Resurfacing
Project Status: Awarded to North Coast Floor & Tile
The following files are available: